670-foot deep, 16-ince diameter well set to yield 3,000 gallons per minute.
Coordinated with the District, USGS and District’s consulting ground water hydrologist to establish the well’s location.
Provided engineering construction drawings, technical specifications, contract documents to drill, oversight of testing and developing the well head to construct the well house and construct a 16-inch transmission line to connect to the District’s existing storage reservoir and distribution system.